CVIS

DEPLOYMENT ENABLERS


The Deployment Enablers activity of the CVIS project provides the integrating strand that links the core technical work to the consideration of non-technical questions such as:


Objectives


The goals of the horizontal Deployment Enablers activity are to:


Key Concepts


The prerequisites for widespread deployment can be stated clearly:

Through this activity activity, the main deployment enablers for CVIS will be derived and embedded in the design activities of the CVIS project. Deployability will be designed from the inside out, and interactively throughout the phases of the project.


To the topTo the top

Main results

 

The DEPN sub-project will address the following task areas:

The outputs will comprise of a CVIS Developers’ Kit with tools, ‘proven’ guidelines and methods to be used in future CVIS development. The DEPN activity will also produce development and deployment Road Maps to move from R&D towards a world of operational CVIS, including the first steps to be taken immediately after the CVIS-project (picking the so-called ‘low hanging fruit’).


These tools are for use by the other CVIS project activities and, once validated, eventually by those wishing to deploy CVIS in pilot- or full-scale implementation.


Key events and milestones


Milestone ref. Milestone Planned date
M.DEPN.1 Final Report 44
M.DEPN.2 Cooperation Architecture and requirements 24
M.DEPN.2 Cooperation Architecture and requirements 45
M.DEPN.3 Safety, security & failure-mode analysis and statement of principles for whole-system security 36
M.DEPN.3 Safety, security & failure-mode analysis and statement of principles for whole-system security 36
M.DEPN.4 Stakeholder utility, data privacy and usability analysis and recommendations 24
M.DEPN.4 Stakeholder utility, data privacy and usability analysis and recommendations 45
M.DEPN.5 Business models and recommendations 40
M.DEPN.5 Business models and recommendations 45
M.DEPN.6 Inventory of risks and threat 18
M.DEPN.6 Inventory of risks and threat 45
M.DEPN.7 Guidelines for policymakers 12
M.DEPN.7 Guidelines for policymakers 45
M.DEPN.8 Roadmaps and recommendations 45


To the topTo the top

Contact

 

Lina Konstantinopoulou

DEPN Sub-project Leader

ERTICO - ITS Europe

E-mail: l.konstantinopoulou@mail.ertico.com

 

 